RMQ8 Rack Mount Kit
Installation Instructions
C813M-A (8/98)
1.0 DESCRIPTION
2.0 INSTALLATION
The RMQ8 Rack Mount Kit provides rack mounting for one Pelco 20-position VA6120
or VA6220 Series Switcher.
To convert a VA6120 or VA6220 Series Switcher from a desktop unit into a rack-
mount unit, assemble the RMQ8 Rack Mount Kit as follows (see Figure 1):
1. Remove the screws retaining the switcher cover.
2. Using the switcher cover screws, attach the rack mount ears to the switcher
and secure the cover to the switcher body.
Figure 1. RMQ8 Rack Mount Kit Installation
In North America and Canada: Tel (800) 289-9100 • FAX (800) 289-9150
|